D3.5
Deliverable 3.5 : Technical architecture status and progress report with particular focus on the development of the German prototype (M 12)
Adrian SMALES : Leader of the D3.5 document
- Wed, March, 10 : D3.5 Document :Table of Contents on wiki
- Contributions by AIT / ATOS / NHM UK
- Thu, April, 15 : Preliminary draft for internal & external review
- Mon, April, 26 : End of review
- Wed, April 28 : Sending the document
Draft for review:
BHL-E_D3-5_v1_AIT-ATOS-MfN.doc
Please comment here or send your comments to Alexander or Gerda.
Updated by Wolfgang
BHL-E_D3-5_v1-1_AIT-ATOS-MfN-MHNW.doc
Final:
-
May 3, 2010 This is the final document I will submit to the EC today. We included the most up to date architecture diagram from Google docs:
BHL-E_D3-5_100430.pdf
Document requirements
- Based on D3.4
- Recap of OAIS & Preservation stacks and challenge (review of different existing solutions in the community)
- Functionnal Architecture, Join community (eg. PASIG), connect with other UE project (eg. CASPAR, SHAMAN) and Open Source projects (Fedora, DuraSpace, ArchiveMatica, iRods, HoneyCom)
- What we've done so far
- Possibility of extedning the project after M36
- Plan for the next 24 month
Outline
- Introduction
- Technical architecture status
- Architecture diagram
- GRIB / GUID integration
- progress report
- development of the German prototype (what the user sees - http://bhl.ait.co.at)
- Pre-Ingest
- Ingest
- DM (zebra)
- AS (FTP server)
- Access (OAI-PMH)
- Portal (multilinguality)
- Roadmap
- Methodology
- Project backlog overview
- Sprints overview